CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp

CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp

Product Condition: New
Product Code: H20TIRMANIR
Seller Rating:    0 Reviews
Availability: In Stock
Görüntüleme 3387 kere

Ürün Açıklaması

CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp


The formwork system used for concrete to be poured piece by piece in order to reach the targeted height in single or double face curtain systems is called climbing formwork system. Climbing is done with a console.


Installation tools:


Carrot (Anchor)

Carrot Knob (Anchor Roller)

Carrot Nut (Anchor nut)

Carrot Wrench Wrench (Anchor Wrench)

climbing console

connecting pipe

Handcuff


Materials required for a set of climbing consoles;


You need to buy 2 carrot sets (Anchor Set) + 2 more to use the mold while doing somersaults.

2 climbing consoles

2 connecting pipes

4 clamps




The following operations are performed when installing the formwork in systems where the climbing formwork system will be used;


1: While the first mold is being set up, the carrots are oiled in sufficient numbers horizontally, leaving a space of 25 cm from the top of the mold, generally at 245 cm intervals (the spaces are narrowed according to the curtain thickness), and mounted to the mold with carrot screws, then the mold installation is completed according to the procedure. Note: Oiling the carrots is necessary for easy removal from concrete.

2: After the poured concrete gains sufficient strength, the carrot screws are removed and the mold is removed.

3: Screws and knobs are mounted on the carrots in the concrete to reach the next height.

4: Climbing consoles are hung by attaching to the knobs, and the consoles are fixed from the bottom and top with the help of pipes and movable clamps. In order to be able to walk on the consoles, planks are thrown over them.

5: The mold installation process in the first step is performed on the consoles. After the poured concrete gains sufficient strength, the mold is dismantled, the consoles are removed, the carrots are removed with a wrench and prepared for the next process.

6: These steps are repeated to reach the targeted height.





SCAFFOLDING AND MOLD SYSTEMS , CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp Fiyatları, H20TIRMANIR

En ucuz CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp, CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp Cazip Fiyat ve alternatifleri hakkında bilgi almak için bizi arayın. Size bir telefon kadar yakınız...

Write a review

Note: HTML is not translated!
    Bad           Good
Captcha
CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp

CLIMBING FORMWORK - H20 - WITH DOKA BEAM SYSTEM - Vario Kalıp

0.00TL